HiTen Sheds Gold Coast is an Australian-owned family business designing and building sheds in the Gold Coast area since 2009.

We are a member of the HiTen Buildings buying group and all of our Sheds use Australian BlueScope steel framing and Colorbond ® cladding for the walls and roof.  

Your shed will be designed and installed with safety and strength as specified by the Australian building code of practice. 

At HiTen Sheds, we aren’t afraid to take on even the most demanding projects. No shed is too large or too small for our experienced team and having ShedSafe® accreditation assures your shed is designed in compliance with your site specific building code.    

This has earned us a reputation as one of the most trusted and reliable suppliers of sheds in South East Queensland and North East NSW.  If you are looking for a new steel shed or any steel structure for your property, then get in touch with us for a FREE, no obligation quote today!

 

Whether you live close to the coast or you’re choosing a colour with energy efficiency in mind, COLORBOND® steel can meet your needs. Download our colour chart to determine the most suitable COLORBOND® steel choices for your next shed.   Apart from our contemporary colour range, we also offer ULTRA, for coastal sea salt protection, and the latest MATT colours.

Frequently Asked Questions

01.

What Warranty Comes with Your Sheds?

All of our sheds, barns and carports come with a 10 Year BlueScope Steel manufacturers warranty on sheeting and portal frames.

02.

How do I Get a Quote or Price for a Shed?

The best way is to drop in for a coffee so we can design your shed on the big screen in 3D and discuss any additional extras you may need. Unlike our competitors, we will give you a complete price on the spot before you leave. Our premier quoting software allows us to customise any building to your exact requirements, regardless of the size you require.

03.

What Extra Costs Will I Be Up For?

In most cases none. Included in the quote price we give you are all of the components needed to build your shed and any applicable delivery fees. If required we will also give you a price for erecting your shed and also laying a concrete slab. All of our shed rainwater connections (gutters and downpipes) are calculated to ground level only. If you require additional drainage or a storm water or tank connection this would be an additional cost. It also assumed that the shed is being built on a level site and that earthworks are not required.

04.

Do I Require Council Approval for My Shed?

In nearly all cases you will need some form of Council approval for your shed. After your deposit is paid we will release watermarked engineering plans, slab and footing engineering, a slab layout diagram and a windload certificate to assist in your Council application. Unfortunately each Council is different and this approval process can take anywhere up to 8 weeks.

05.

How Long Before I Get My Shed?

Depending on whether you need Council approval, it usually takes 3 to 4 weeks to manufacture and deliver all the componentry to site. If Council approval is required, we will not order your shed until the approval has been received.